Up to $12.25M for “USS Buttercup” Damage Control Trainer Refurb
Feb 28, 2008 13:48 UTC by Defense Industry Daily staffWhen things go wrong on a naval ship, they can go very badly wrong indeed. Accidents, hostile fire, or hazardous conditions can force a crew to fight to save their vessel. Since humans don’t survive very well in open ocean, it’s usually a fight to save themselves as well. Effective damage control is a critical sailor’s skill, one that cannot be provided as effectively by automated systems. Executing it often requires iron nerve as well as knowledge, which is why testing and training needs to be as realistic as possible.
The Haskell Co. in Jacksonville, FL recently won a $12 million firm-fixed price task order under a previously awarded indefinite-delivery/ indefinite-quantity, multiple award construction contract (N62472-01-D-0075/ 0004), to design and build a 2 story Damage Control School Trainer Facility at Naval Support Activity, Norfolk, VA. The facility will provide student training on techniques to arrest ship flooding situations. Construction includes a damage control wet trainer (“USS Buttercup”), trainer rooms, classrooms, and support spaces. Demolition includes a portion of Building #N30 (also including a pool, trainer device and associated equipment) where the current wet-trainer exists on Naval Station, Norfolk. The contract contains one additional option totaling $220,000, which may be exercised within 120 calendar days, bringing the total contract amount to $12.25 million. Work is expected to be complete by September 2009. The Naval Facilities Engineering Command, Mid-Atlantic in Norfolk, VA received 2 proposals for this task order.