Grand Salaam! Eurofighter Flies Off With Saudi Contract

RSAF Eurofighter
RSAF Eurofighter

In 2005 talks were underway for a Saudi purchase of Eurofighter Typhoon Tranche 2 advanced air superiority and strike aircraft from Britain’s BAE Systems – with an important (albeit denied) set of conditions on the Saudi side.

December 2005 saw confirmation that Saudi Arabia had ordered Eurofighter Typhoons, but the 72-plane deal started sinking into the tar sands shortly thereafter. Investigations from Britain’s Serious Fraud Office swirled around a GBP 43 billion oil-for-planes deal from the 1980s called Al-Yamamah (see Appendix A); in return, the Saudis played some hardball of their own. The investigation was eventually called off at the highest levels of government, and later confirmed by the House of Lords. After a period of uncertainty, a contract was finally signed on Sept 11/07. Ironies aside, the price was a bit lower than many expected; even so, it comes with support arrangements that are likely to push the final value quite a bit higher.

This DID Spotlight article covers the Saudi Eurofighter deal, its associated controversies, and related developments.

Britain’s Future CVF Carriers: the Queen Elizabeth Class

Advertisement
CVF Concept
RN CVF Concept

Britain’s 1998 Strategic Defence Review (SDR) announced a big leap forward for the Royal Navy: plans to replace the current set of 3 Invincible Class 22,000t escort carriers with 2 larger, more capable Future Aircraft Carrier (CVF) ships that could operate a more powerful force. These new carriers would be joint-service platforms, operating F-35B aircraft, plus helicopters and UAVs from all 3 services. Roles could include ISR (Intelligence, Surveillance & Reconnaissance), force projection and logistics support, close air support, anti-submarine/ anti-surface naval warfare, and land attack.

The scale of the CVF effort relative to Britain’s past experiences means that the program structure is rather complex. It has passed through several stages already, and is being run and conducted within an industrial alliance framework. There is also a parallel international framework, involving cooperation with France on its PA2 carrier as a derivative of the CVF design. This DID FOCUS article covers that structure and framework, ongoing developments, and the ships themselves as they move slowly through construction, and eventual fielding.

Samson’s Wings: Israel Orders ‘Special’ C-130J-30s

Israeli C-130
Israeli C-130

In July 2008, the US Defense Security Cooperation Agency announced Israel’s request to buy up to 9 stretched C-130J-30 aircraft, which will replace some of the aging C-130 aircraft that Israel made famous in its 1976 commando raid at Entebbe, Uganda.

It took some time, but Israel finally became the 13th C-130J customer nation in April 2010. Appropriately, Israel’s new “Samson” planes will contain a number of features associated with the new special forces variants bought by India and the USA. The program of up to 9 planes looks like it will take a while to finish, though…

US Carrier Pilots’ T-45 Training System

Advertisement
T-45s on Carrier
Do you feel lucky…?

The T-45 Training System includes T-45 Goshawk aircraft, advanced flight simulators, computer-assisted instructional programs, a computerized training integration system, and a contractor logistics support package. The integration of all 5 elements is designed to produce a superior pilot in less time and at lower cost than previous training systems.

The US Navy uses the Hawk-based T-45TS system to train its pilots for the transition from T-6A Texan II/ JPATS aircraft to modern jet fighters – and carrier landings. This is not a risk-free assignment, by any means. Nevertheless, it is a critical link in the naval aviation chain. This DID FOCUS article covers the T-45TS, and associated contracts to buy and maintain these systems:

Ship to Shore Connector: the USN’s New Hovercraft

Textron SSC conception
SSC concept

The Ship to Shore Connector (SSC) hovercraft program aims to build on the USA’s LCAC hovercraft experience, and retain the US Navy’s unparalleled transport options from ship to shore and beyond. LCACs launch from inside the well deck of an amphibious warship, then travel the waves at high speed, run right through the surf zone near the beach, and stop at a suitable place on land. Their cargo walks or rolls off. The LCAC(Landing Craft, Air Cushion) returns to the surf to pick up more. Rinse. Agitate. Repeat.

These air-cushioned landing craft are much more capable than the conventional flat-bottomed landing boats used by other countries, but that capability comes at a price. LCACs were expensive to buy, suffered from corrosion and maintenance issues, and remain quite expensive to operate and maintain after many years in service. The other problem is that tanks and other vehicles have gotten heavier, so carrying equipment like the Marines’ latest M1 Abrams can push current LCACs to their capacity limits.

Countries like France are designing fast catamaran landing craft for over-the-horizon delivery at a lower price point, and modern hovercraft offer new options of their own. The US Navy looked at the possibilities, then decided to ask for an upgraded version of the current LCACs. SSC was born, and in 2012 it finally moved into system development.

Norway Renews Its Tactical Transport Fleet

C-130H Norwegian Torbjorn Kjosvold
Norwegian C-130H by
Torbjorn Kjosvold

Back in February 2007, the Norwegian Forsvarsnett said:

“The Armed Forces have six C-130H Hercules transport aircrafts today [DID: 335 skv, out of Oslo-Gardermoen]. These were bought in 1969 and are outdated. Recent updates have made them able to be operational until 2012-15, but it is now known that the planes need further work done to them still. Therefore the Norwegian government has started investigating the possibility of either renting or buying up to four new planes of the type Hercules C-130J.”

Faced with the prospect of further C-130H refurbishment work on one hand, and entreaties by the A400M consortium on the other, Norway needed to decide what to do. They did, and the decision promptly came under political attack – but a deal was done for 4 stretched C-130J-30s, and the final aircraft flew off to Norway in July 2010. There are just 3 left now, but soon, there may be 5.

DDG Type 45: Britain’s Shrinking Air Defense Fleet

Type 45 UK
Daring Class

The 5,200t Type 42 Sheffield Class destroyers were designed in the late 1960s to provide fleet area air-defense for Britain’s Royal Navy, after the proposed Type 82 air defense cruisers were canceled by the Labour Government in 1966. Britain built 14 of the Type 42s, but these old ships are reaching the limits of their operational lives and effectiveness.

To replace them, the Royal Navy planned to induct 12 Type 45 Daring Class destroyers. The Daring class would be built to deal with a new age of threats. Saturation attacks with supersonic ship-killing missiles, that fly from the ship’s radar horizon to ship impact in under 45 seconds. The reality of future threats from ballistic missiles, and WMD proliferation. Plus a proliferation of possible threats involving smaller, hard to detect enemies like UAVs. Overall, the Type 45s promise to be one of the world’s most capable air defense ships – but design choices have left the cost-to-value ratio uncertain, and limited the Type 45s in other key roles.

This feature will become a subscription-only DII FOCUS article in due course. Meanwhile, a reduced 6-ship program continues to move forward.

Britain’s A330 Voyager FSTA: An Aerial Tanker Program – With a Difference

A330 MRTT UK FSTA concept
FSTA Concept

Back in 2005, Great Britain was considering a public-private partnership to buy, equip, and operate the RAF’s future aerial tanker fleet. The RAF would fly the 14 Airbus A330-MRTT aircraft on operational missions, and receive absolute preferential access to the planes. A private contractor would handle maintenance, receive payment from the RAF on a per-use basis – and operate them as passenger charter or transport aircraft when the RAF didn’t need them.

The deal became politically controversial, and negotiations on the 27-year, multi-billion pound deal charted new territory for both the government, and for private industry. Which may help to explain why a contract to move ahead on a “Private Financing Initiative” basis had yet to be issued, and procurement had yet to begin, over 7 years after the program began. In March 2008, however, Britain issued the world’s largest-ever Defence Private Finance Initiative (PFI) contract. This FOCUS Article describes the current British fleet, the aircraft they chose to replace them, how the new fleet will compare, the innovative deal structure they’ve chosen, and ongoing FSTA developments.

24-Year, GBP 1.5B contract to Maintain UK’s Hercules Fleet

Latest updates: Major deal adds HIOS segment to 2015.
C-130J UK Underside Bank
UK C-130 C5

In mid-2006 the UK MoD added another platform to the expanding list of long-term, performance-based, public-private, “contracting for availability” maintenance solutions for Britain’s key military platforms, by awarding Marshall Aerospace a GBP 1.52 billion contract ($2.86 billion conversion back then) to begin supporting its fleet of C-130 Hercules transport aircraft until 2030.

The deal has several segments, with mechanisms for price adjustments upward and downward as the contract continues. Britain’s SDSR plans may also cut the deal off early, if the entire C-130 fleet retires by 2022 as planned. As prime contractor, Marshall Aerospace is working in partnership with the Defence Logistics Organisation (DLO), the Royal Air Force, Lockheed Martin and Rolls-Royce to deliver the Hercules Integrated Operational Support (HIOS) programme. The HIOS programme will provide guaranteed levels of aircraft availability to a fleet that includes both older C3/C1 models (C-130K stretched and normal) and C4/C5 models (C-130J-30 and C-130J).

Replacing Canada’s Failing CC-130s: 17 C-130Js

CC-130 AAR BC
CC-130 over BC

The US military has been coming to the realization that its aging aircraft fleet will begin posing serious challenges in the coming years. Canada is experiencing similar problems. In 2005, Chief of the Defence Staff Gen. Rick Hillier said that:

“Our [CC-130 E/H] Hercules fleet right now is rapidly going downhill. We know that three years and a little bit more than that, the fleet starts to become almost completely inoperational and we will have to stop supporting operations – or else, not be able to start them.”

This Spotlight article offers additional details regarding the Canadian CC-130 recapitalization program, and the thinking behind it; some background that points up the parallels between the issues faced by the Canadians, and the experiences of other air services; and some insight into why the buy took so long, after the C-130J was declared Canada’s preferred choice in an “expedited” process. Canada has begun using the new planes on operations, and is preparing to accept the last “CC-130J.” This will shift its focus to issues of long-term support costs.

  1. 1
  2. 2
  3. 3
  4. 4
  5. 5
  6. 6
  7. 7
  8. 8
  9. 9

Stay Up-to-Date on Defense Programs Developments with Free Newsletter

DID's daily email newsletter keeps you abreast of contract developments, pictures, and data, put in the context of their underlying political, business, and technical drivers.