IDGA Software Radio - Click Here!

$176.2M for “Minuteman Propulsion Replacement Program”

Related Stories: Americas - USA, Contracts - Modifications, Missiles - Ballistic, Northrop-Grumman, Nuclear Weapons, Other Corporation, Partnerships & Consortia, Support & Maintenance

Advertisement
ORD_ICBM_LGM-30G_Minuteman-III_Launch_Dark.jpg
LGM-30G Minuteman III
(click to view full)

Northrop Grumman Space and Mission Systems of Clearfield, UT received a contract modification for $176.2 million, exercising the Minuteman III Intercontinental Ballistic Missile Propulsion Replacement Program’s (PRP) final full rate production (year 7) option. NGC tends to sub-contract large portions of this work to ATK Thiokol; the Minuteman III PRP began in 1998 as a Joint Venture between ATK and Pratt & Whitney, but all work content was transitioned to ATK in the 2003-2004 timeframe following a contract restructure. DID has covered related contracts in November 2006 ($222.5 million), March 2006 ($541 million) and January 2006 ($225.2 million). Presumably, the ICBMs’ Environmental Protection Agency certification has been taken care of by now.

The purpose of PRP is to ensure MM Flight Reliability and supportability of the USA’s LGM-30G Minuteman III nuclear ICBMs through 2020 by correcting identified mission threatening degradations, sustaining existing reliability, and supporting Minuteman Life Extension Efforts. America chose to retire its larger, newer, and more capable MX Peacekeeper missiles in 2005, in compliance with arms control treaties it has signed. This contract action will purchase the remaining 56 Minuteman III booster sets, making a total of 601 sets acquired during the PRP. At this time, $51.6 million has been obligated. The 526th ICBM Systems Wing at Hill Air Force Base, UT holds the contract (F42310-98-C-0001). See also Northrop Grumman release.

Images on Defense Industry Daily

Defense Industry Daily does not own the rights to the images displayed on our site. We use images under "fair use" copyright doctrine, from public sources and private organizations, or use images under Creative Commons/ GNU licenses that make them available to the general public, or with explicit and noted permission. All rights remain with the original image owners.

If you believe that a DID image may violate these conditions, please discuss it with us via an email to editorial@defenseindustrydaily.com

The sizes displayed on DID are the only sizes we have to offer.


Close