This article is included in these additional categories:

Contracts - Awards | Heavy Bombers | Northrop-Grumman | Support & Maintenance | USA

$109.6M for Improved B-2A Bomber Heat Shields

For more on this and other stories, please consider purchasing a membership.
If you are already a subscriber, login to your account.
B-2A Spirit(click to view full) In September 2011, Northrop Grumman Aerospace Systems in Palmdale, CA received a $109.6 million a firm-fixed-price contract “for aft decks applicable to B-2 aircrafts.” We asked Northrop Grumman about this, and they said that this stealth bomber contract was about buying spares with improved durability. The aft deck shields the composite airframe from the heat of the engines’ exhaust, and the redesign follows a thorough thermal and structural analysis of the aft deck, its adjoining structures and the operating environment. Work will be performed in Palmdale, CA and in St. Augustine, FL, until April 19/16. The Defense Logistics Agency Aviation at Tinker Air Force Base, OK manages the contract (SPRTA1-11-C-0112). While the B-2 fleet’s FAST umbrella contract covers most modifications and maintenance, this is separate from FAST.

One Source: Hundreds of programs; Thousands of links, photos, and analyses

DII brings a complete collection of articles with original reporting and research, and expert analyses of events to your desktop – no need for multiple modules, or complex subscriptions. All supporting documents, links, & appendices accompany each article.

Benefits

  • Save time
  • Eliminate your blind spots
  • Get the big picture, quickly
  • Keep up with the important facts
  • Stay on top of your projects or your competitors

Features

  • Coverage of procurement and doctrine issues
  • Timeline of past and future program events
  • Comprehensive links to other useful resources